
Flexible MOQ — Start at 20 Pieces
Custom OEM projects begin at just 20 pieces. You do not need to commit to a massive container load to get started. Sample orders are supported and negotiated case by case.
End-to-end custom development from concept to production in 4–6 weeks. Toray carbon fiber, Nippon UV-clear coat, NDA protected. Your design stays yours.

Custom OEM projects begin at just 20 pieces. You do not need to commit to a massive container load to get started. Sample orders are supported and negotiated case by case.

Mold structure design and CNC machining are completed in as few as 3–7 days. From design kickoff to production-ready shipment, the complete cycle takes only 4–6 weeks—significantly faster than the industry norm of 2–3 months.

We are an ISO 9001, CE, and ROHS certified manufacturer. You work directly with the factory engineers, ensuring strict quality control, straightforward communication, and no middleman markup.
Combine authentic carbon fiber weaves with personalized branding to deliver a product that is unmistakably yours.
We use authentic Japanese Toray 3K carbon fiber prepreg with zero glass fiber fillers.







Shelf-ready delivery including laser-etched surface logos, custom branded boxes, hang tags, and barcode labeling.
Discuss Your SpecificationsSee exactly how our engineering team transforms your reference part or 2D drawing into a finished carbon fiber product within 4–6 weeks.





We sign a strict NDA before any technical discussion, legally protecting all your drawings, 3D data, and reference samples.
Shasha grants exclusive mold authorization. We contractually guarantee not to produce your parts for any other client in your territory.
Digital files are stored on access-controlled servers, and physical samples are cataloged by project codes to ensure complete client anonymity.

Your IP stays yours — guaranteed by contract, not just a promise.
Send us your drawing, reference part, or idea — our engineering team responds within 12 hours with a feasibility assessment and timeline. NDA signed before any technical discussion.